Somewhere between Christmas and New Year's, most offices go quiet. Half the building is on PTO, the other half is working from home, and the floor is emptier than it will be at any other point in the year. That week is the single best window you get for moving furniture — and almost nobody plans for it in time to use it.
Reconfiguring an occupied office during a normal work week means displacing people, boxing up desks, and losing a day or two of productivity across a department. Doing the same work during a shutdown costs you none of that. The catch is that the ordering has to happen weeks earlier than feels necessary. Here's how to set it up.
A shutdown week is short, so it rewards a specific problem and punishes a vague ambition. "Modernize the office" is not a plan. "Convert the two dead offices on the north wall into a four-person team room and a phone room" is.
The complaints you've been hearing all year are usually the brief. People can't find a room for a video call. The sales team is scattered across three pods. The file room holds records nobody has opened since 2019 while everyone's desk is buried. Pick one or two of those, scope them honestly, and leave the rest for next year. A reconfiguration that finishes is worth more than an ambitious one that leaves the floor half-torn-apart on January 5.
The measurement that sinks holiday projects isn't the room — it's everything between the truck and the room. Before you order anything, walk the route a crate has to travel and write down the numbers: dock height or curb, door widths, hallway turns, elevator car depth and door opening, and stair landings if there's no elevator.
Conference tables and reception desks are the usual casualties. A 12-foot boat-shaped top that fits the room beautifully may not make the turn out of the elevator lobby. Knowing that in November means ordering a segmented top instead; discovering it on December 29 means the table goes back on the truck. Check with your property manager in the same pass — many buildings require dock reservations, certificates of insurance from anyone moving freight, and after-hours elevator scheduling, and those offices are thinly staffed in late December too.
Work the calendar in reverse. You want furniture delivered and staged before the shutdown starts, not during it, because carriers run reduced schedules that week and a missed delivery has nowhere to land.
That means targeting delivery in the week or two before the holidays, which in turn means ordering well ahead of it. Stocked product generally ships within a few business days and then spends roughly three to seven business days in LTL freight transit. Made-to-order product adds production time on the front end, and Q4 is when production queues are longest. Panel systems and cubicles can take longer still, because the layout gets engineered before anything is built. If you're planning a shutdown reconfiguration, stocked product and in-stock cubicle systems are what make the timeline realistic.
Build in a buffer week. December freight absorbs two federal holidays and a lot of weather, and a shipment that slips three days in July slips ten in December.
A realistic scope for a few quiet days, assuming the furniture is already on site:
What doesn't fit: anything requiring electrical or data work, permits, or a trade you'd have to schedule. If a change needs an electrician to move a floor box, it isn't a shutdown project.
Every reconfiguration produces a pile of furniture that no longer has a home, and nothing stalls a January reopening like a conference room full of orphaned chairs. Decide the fate of each piece before the week starts: redeployed to another floor, stored, donated, or removed. Label it physically, and give the removal a date on the same calendar as the delivery. In some markets USDO can help coordinate removal of what you're replacing — worth asking about while you're getting the new furniture quoted, not after the old furniture is stacked in the hallway.
The reconfiguration is judged on January 5, not December 29. Send a short note before the break telling people what will be different and where they'll be sitting, and put temporary signage on the floor so nobody spends their first morning back hunting for their team.
Leave the last afternoon of the project for the unglamorous part: chairs adjusted to a neutral starting position, monitor arms tightened, cable slack managed, boxes and packaging out of the building, and floors clear. A reconfiguration that people walk into finished reads as intentional. The same reconfiguration with packaging still in the corner reads as a project that ran out of time.
Holiday reconfigurations are won in October and November, not in December. You can order online whenever you're ready, and for anything bigger than a seating swap, request a quote and we'll build itemized pricing with delivery dates that land before your shutdown rather than inside it. If you're changing the layout itself, our free office furniture space planning service will produce a drawing first, so the furniture is ordered against a floor plan instead of a guess. We ship new office furniture to all 50 states, and there are partner showrooms in 11 major metro areas if you want to sit in the seating before you commit to a floor's worth of it.